|
|
Renovating School 167
Our mandate also includes strengthening the educational infrastructure
through providing both the educational materials and bettering the physical
conditions of the institutions themselves.
The project at School 167 included:
-
Renovating the classrooms and providing proper school
desks, at a cost of $12,500.
-
Equipping and setting up a Computer Lab for children,
at a cost of $6150.
- Provided educational books 500 children in Grades 1 – 4, at
a cost of $1400.
- Provided educational videos for Kindergarten through Grade 4, at a
cost of $4600.
|